Followers

Saturday, April 5, 2008

Bridges Jobsite west of the Gateway Mall in Downtown SLC, UTAH


I know this Post has a lot of photos but I went down to the job site today with Eli and Ashton and so I finally remembered to bring the camera. So to keep it brief I will write a small detail by each picture. Eli went to the top of the 2nd bldg. and took a pic of I-15 he is facing west. This is also on the roof looking at the mall. IT gives you an idea of what the beautiful surrounds are around the apartments.




This picture is the stair/elevator shaft, as you can tell it is not completed yet just a concrete brick hole.

The picture directly below is another view from the roof looking north east, you can see the capital building to the right.



The picture to the left is of the the phase 1 building and parking garage that the cement to the left is the freeway. On the positive side you have quick on and off to the freeway.

Below is the first building, The roof is on and they have the windows, and are getting ready for exterior and waiting for the bridge connecting the two buildings before it can pass the inspections.


Eli and Ashton standing by the crane. I took one of the outhouse, I thought it was funny with the stickers on the outside and the green saying it is ready for use.



This is the commuter train they are going to have running by the end of the month, yes just south of the job site is a major train line.

The bridge that connects the 2 buildings.

Just past the bridge you can see how close the buildings are to each other.

Yeah, I wont be living there, I just thought the sign was funny, good advertising right by the freeway.


This is the 4th bldg.
Below is looking at the gateway and it does have a temple view, if you look close.
The crane that they use to move walls.





No comments: